Progress continues on the build with lots of important, but relatively small things all happening. The bungalow itself is scheduled to arrive in the last week of April, so when you have read this post, remember to “watch this space”.
The bungalow foundation plinth is now ready for the floor screed to be poured on the first dry day we can get! The damp proof & anti-radon membrane is laid followed by a hi-load DPC prior to the sole plate being fixed